Loading
Asst. Prof. Dr. Thitipong Jamrus

Asst. Prof. Dr. Thitipong Jamrus

ภาควิชาวิศวกรรมอุตสาหการ,
Faculty of Engineering,
Khon Kaen University
56479205300: H-INDEX 5

Documents

TCI อ้างอิงจาก http://www.tci-thaijo.org/

0

SCOPUS

0

PUBMED

0

ISI

0

TCI

Title Author Year SCOPUS PUBMED ISI TCI
1. Multistage production distribution under uncertain demands with integrated discrete particle swarm optimization and extended priority-based hybrid genetic algorithm Jamrus, T.
Sethanan, K.
2015
2. Extended priority-based hybrid genetic algorithm for the less-than-container loading problem Jamrus, T. 2016
3. A hybrid particle swarm optimization for the generalized assignment problem with time window Sethanan, K.
Jamrus, T.
2018
4. Differential evolution algorithms with local search for the multi-products capacitated vehicle routing problem with time windows: A case study of the ice industry Sethanan, K.
Jamrus, T.
2018
5. Hybrid Particle Swarm Optimization Combined With Genetic Operators for Flexible Job-Shop Scheduling Under Uncertain Processing Time for Semiconductor Manufacturing Thitipong Jamrus
Chen-Fu Chien
Mitsuo Gen
Kanchana Sethanan
2018
6. Dynamic coordinated scheduling for supply chain under uncertain production time to empower smart production for Industry 3.5 Jamrus, T. 2020
7. Hybrid PSO and ALNS algorithm for software and mobile application for transportation in ice manufacturing industry 3.5 Pitakaso, R.
Sethanan, K.
Jamrus, T.
2020
Count 7 0 4 0

Title Authors Year Publication name Cited count
< 2015 2016 2017 2018 2019 2020 Total
1. Multistage production distribution under uncertain demands with integrated discrete particle swarm optimization and extended priority-based hybrid genetic algorithm Jamrus, T.
Sethanan, K.
2015 Fuzzy Optimization and Decision Making
3 (14), pp. 265-287
2. Extended priority-based hybrid genetic algorithm for the less-than-container loading problem Jamrus, T. 2016 Computers and Industrial Engineering
(96), pp. 227-236
3. A hybrid particle swarm optimization for the generalized assignment problem with time window Sethanan, K.
Jamrus, T.
2018 MATEC Web of Conferences
(192), pp.
4. Differential evolution algorithms with local search for the multi-products capacitated vehicle routing problem with time windows: A case study of the ice industry Sethanan, K.
Jamrus, T.
2018 Engineering and Applied Science Research
4 (45), pp. 273-281
5. Hybrid Particle Swarm Optimization Combined With Genetic Operators for Flexible Job-Shop Scheduling Under Uncertain Processing Time for Semiconductor Manufacturing Jamrus, T.
Sethanan, K.
2018 IEEE Transactions on Semiconductor Manufacturing
1 (31), pp. 32-41
6. Dynamic coordinated scheduling for supply chain under uncertain production time to empower smart production for Industry 3.5 Jamrus, T. 2020 Computers and Industrial Engineering
(142), pp.
7. Hybrid PSO and ALNS algorithm for software and mobile application for transportation in ice manufacturing industry 3.5 Pitakaso, R.
Sethanan, K.
Jamrus, T.
2020 Computers and Industrial Engineering
(144), pp.

Title Authors Year Journal title

Title Authors Year Journal title Cited count
< 2015 2016 2017 2018 2019 2020 Total
1. Multistage production distribution under uncertain demands with integrated discrete particle swarm optimization and extended priority-based hybrid genetic algorithm Thitipong Jamrus
Chen-Fu Chien
Mitsuo Gen
Kanchana Sethanan
2015 FUZZY OPTIMIZATION AND DECISION MAKING
3.0 (14.0), pp. 265.0-287.0
34 0 0 0 0 0 34
2. Extended priority-based hybrid genetic algorithm for the less-than-container loading problem Thitipong Jamrus
Chen-Fu Chien
2016 COMPUTERS & INDUSTRIAL ENGINEERING
(96.0), pp. 227.0-236.0
5 0 0 0 0 0 5
3. Hybrid Particle Swarm Optimization Combined With Genetic Operators for Flexible Job-Shop Scheduling Under Uncertain Processing Time for Semiconductor Manufacturing Thitipong Jamrus
Chen-Fu Chien
Mitsuo Gen
Kanchana Sethanan
2018 IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING
1.0 (31.0), pp. 32.0-41.0
27 0 0 0 0 0 27
4. Dynamic coordinated scheduling for supply chain under uncertain production time to empower smart production for Industry 3.5 Thitipong Jamrus
Hung-Kai Wang
Chen-Fu Chien
2020 COMPUTERS & INDUSTRIAL ENGINEERING
(142.0), pp.
3 0 0 0 0 0 3

Title Authors Year Journal title

Title Authors NRIIS type Year NRIIS Scholarship

0.014561891555786133